CN
Current Position: Home > Resources> Case Study
Panoramic AI+ Intelligent Construction
Panoramic AI+ Intelligent Co✘ '↑nstruction
Reduce risks and rework changes ® ↔‍for the Project of Un↕≈∑≈iversity of Chinese Academy of £¶&λTraditional Chinese Medicin for China₽☆ Construction Third Engine≥±☆¶ering Bureau Group CO☆©​.,LTD. Online messag↓γ✘↔e.

Project background:

The University of Chinese Academy o> f Traditional Chinese Med©πicine is located in the south of Gard¶±←en Expo Park Road and the west of ¶↕ Huanzhen Road, Wuzhong DisΩ‌∑÷trict, Suzhou, with a toαα₽tal land area of 406,6₹‍77.6 square meters and a tot®★al construction area of 32π'1,660.0 square meters. Th≤♠φe overall construction volum&∏e is large, which puts f ♥™orward higher requirements fo∏♥γr construction management.


Facing challenges:

Improve the company's e‍ε¶¶xisting data recording process; ¥"
Improve the network signal lim←π"≤itation of remote real-time×↕ video patrol;
Discover potential risks in time and s•‌$↔ave time through online high-£₽frequency patrol;


Strategy:

Use the LEEM·Shadow 360 Space-time Tw ¶↔‍in Management Platform to apply t¥✔₹he remote management and online i≤↔nspection of the project.

Simple and convenient↓♥α to use, no need for on-site ne→←Ωφtwork, simple training can be mastered☆♥;

Mechanical and electricβ"al engineering intensive areas, throβπεugh BIM comparison to re<‍≤view the installation of♦Ω​λ functions;

High-frequency patrol, disco€✔→∑ver risk points in advance, and coopε₩₽erate with one button to avoid causin≈★π→g heavy losses;

Save more than 15 hours a week;